The photo above is a Twiggy Mk1 from France

This presentation documents the construction of a modified version of Lock Crowther's famous Twiggy Mk 2 trimaran

Friday, November 1, 2013

Floats in storage:


Floats tarped and set aside until the main hull and beams are made.
Then hulls can be aligned and beams/bulkheads drilled through for bolts. 
This will guarantee that bolt holes all line up and hold the hulls in the proper orientation.
After all this the decks can be installed on the floats.

No comments:

Post a Comment