The photo above is a Twiggy Mk1 from France

This presentation documents the construction of a modified version of Lock Crowther's famous Twiggy Mk 2 trimaran

Sunday, November 4, 2012

Fiberglassing

 glass cloth positioned dry


- cloth overlaps the keel 2" from both sides
- two strips of cloth, 2" and then 3" wide, were previously epoxied over the keel
- this gives 4 layers over the keel for toughness
epoxy was applied by 10" window style squeegee 
small stapled wood scraps holding the cloth will be removed after wetout

No comments:

Post a Comment