The photo above is a Twiggy Mk1 from France

This presentation documents the construction of a modified version of Lock Crowther's famous Twiggy Mk 2 trimaran

Sunday, July 8, 2012

Keel protection

 1/8" oak laminations on stem for toughness
soild oak strips at stern for toughness

Saturday, July 7, 2012

Okoume plywood

Okoume plywood for the cabin and beams arrives
3/8" okoume plywood with 7 layers
BS 1088 stamp

Wednesday, April 11, 2012

3rd layer of veneer done

narrower 1.5" wide veneer strips were used around the curve of the bilge
3rd layer of cedar veneer filled and sanded fair, ready for glass cloth

Tuesday, April 10, 2012

Wednesday, March 7, 2012

2nd layer done

 the surface will be sanded fair before the next layer goes on

staples and straps have been removed

Tuesday, February 21, 2012

2nd layer of veneer started





 wedges driven under the straps align "wild" edges
 wax paper facilitates removal after cure
plenty of wedges

Thursday, February 16, 2012

1st layer of cedar veneer done

 Cedar veneers glued edge to edge
 1st layer of 1/8" cedar veneer done and sanded

pencil lines show stringer locations for accurate stapling of the next layer