Family interest arranges a viewing
The photo above is a Twiggy Mk1 from France
This presentation documents the construction of a modified version of Lock Crowther's famous Twiggy Mk 2 trimaran
Wednesday, February 15, 2012
Tuesday, February 14, 2012
Friday, February 3, 2012
Stringers faired and ready
stringers faired in at bow
and at stern
tapered stringer's free ends held fair with fishing line
drainage channels along bilge stringers
Friday, January 27, 2012
Making cedar veneer - lots of it!
Planing 1/8" red cedar veneers
each hull gets 3 layers
approx 1200 sq ft needed for floats and mainhull
Thursday, January 26, 2012
Bandsaw and Planer
Walker Turner 16" bandsaw with 5 hp electric motor
- used a 1" x 4 tpi bimetal blade with alternate set teeth for ripping fir and cedar planks to rough size for stringers, gunnels , keels - blade speed 2400 feet/min.
- used a Doall 1" x 4 tpi honeycomb knife blade with "0" set teeth and 0.032" kerf for slicing 3/16" cedar strips up to 10" wide (DOALL028) - similar to a hollow ground saber saw blade
- the cedar veneer was sawn to about 3/16", then planed both sides to 1/8"
- Ryobi 13" planer was used for planing to finish sizes, removing about 1/64" per pass for the veneer
- 1/8" cedar veneers were passed through the planer on a true flat 2"x10" spruce plank for support
- the bandsaw and planer were mounted 10 feet from the feed end of a 26 foot x 18" bench
- a 24"x24" door was located in the garage wall at the feed end of the bench, and when open 16 foot stock could fit on the feed end by sliding out through the small door
Wednesday, January 25, 2012
Stringer and gunnel details
stringers with breast hooks at stem
detail at frame 8
detail at frame 9 and keel for drainage
stringers with breasthooks at stern
stringers at bow - plenty of strength
gunnel doublers tapered at ends
Note tapered stringers to avoid hard spots
Monday, January 9, 2012
Subscribe to:
Posts (Atom)
























