The photo above is a Twiggy Mk1 from France

This presentation documents the construction of a modified version of Lock Crowther's famous Twiggy Mk 2 trimaran

Monday, June 1, 2020

Cabin construction begins!

 hull is now moved into garage #2 with more headroom 
to accommodate cabin construction
 top half frames carefully scarfed onto hull bottom half frames
 care taken to check they are plumb

Friday, May 15, 2020

Sunday, May 10, 2020

Storage along aft cabin sides

 handy storage along edge of seating in aft cabin
steering cables will also pass thru this storage area

Friday, May 1, 2020

Head sink cabinet


curved shape leaves more floor space for showering

a nice continuation of the galley cabinets too,
counter edge trim to be added

 finished cabinet with trim

Wednesday, April 1, 2020

Forward and Aft Berth watertight Hatches/Storage

 1/16" neoprene gaskets installed,
stainless bolts into threaded inserts as hold downs,
these are the 2 hatches in the forward berth
 these watertight compartments can be used for storage by removing the hatch lids,
these are the 3 hatches in the aft berth




Wednesday, January 1, 2020

Floors

 floor supports glued to cabinetry front

 floors are 3/8" okoume ply with epoxy and 6 oz glasscloth both sides