Twiggy Mk2 Trimaran
"Flight Feather"
Sunday, February 14, 2021
Crossbeam Construction
›
above the bench on the shelf are clear cedar strips 13/16" x 1.5", already scarfed together to form 30 foot lengths, 40 of them al...
Monday, June 1, 2020
Cabin construction begins!
›
hull is now moved into garage #2 with more headroom to accommodate cabin construction top half frames carefully scarfed onto hul...
2 comments:
Friday, May 15, 2020
Foredeck stringers and kingplank
›
2 layers of 4mm okoume ply will cover ample deck camber
Sunday, May 10, 2020
Storage along aft cabin sides
›
handy storage along edge of seating in aft cabin steering cables will also pass thru this storage area
Friday, May 1, 2020
Head sink cabinet
›
curved shape leaves more floor space for showering a nice continuation of the galley cabinets too, counter edge trim to be added...
Wednesday, April 1, 2020
Forward and Aft Berth watertight Hatches/Storage
›
1/16" neoprene gaskets installed, stainless bolts into threaded inserts as hold downs, these are the 2 hatches in the forward b...
Wednesday, January 1, 2020
Floors
›
floor supports glued to cabinetry front floors are 3/8" okoume ply with epoxy and 6 oz glasscloth both sides
›
Home
View web version