Twiggy Mk2 Trimaran

"Flight Feather"

Sunday, February 14, 2021

Crossbeam Construction

›
above the bench on the shelf are clear cedar strips 13/16" x 1.5", already scarfed together to form 30 foot lengths, 40 of them al...
Monday, June 1, 2020

Cabin construction begins!

›
 hull is now moved into garage #2 with more headroom  to accommodate cabin construction  top half frames carefully scarfed onto hul...
2 comments:
Friday, May 15, 2020

Foredeck stringers and kingplank

›
2 layers of 4mm okoume ply will cover ample deck camber 
Sunday, May 10, 2020

Storage along aft cabin sides

›
 handy storage along edge of seating in aft cabin steering cables will also pass thru this storage area
Friday, May 1, 2020

Head sink cabinet

›
curved shape leaves more floor space for showering a nice continuation of the galley cabinets too, counter edge trim to be added...
Wednesday, April 1, 2020

Forward and Aft Berth watertight Hatches/Storage

›
 1/16" neoprene gaskets installed, stainless bolts into threaded inserts as hold downs, these are the 2 hatches in the forward b...
Wednesday, January 1, 2020

Floors

›
 floor supports glued to cabinetry front  floors are 3/8" okoume ply with epoxy and 6 oz glasscloth both sides
›
Home
View web version
Powered by Blogger.