Saturday, January 31, 2015

Frame 2 install

 - frame 2 installed at 25 degrees from vertical to align with forestay
- lower tang shown will connect to and help support upper tang (to be installed later)
- the ss bar connector will be removeable to allow access forward
25 degree inclination

Saturday, January 24, 2015

custom keel bolts

- 3/8" ss keel thru bolts prevent splitting the case when the daggerboard hits bottom
- the daggerboard will break first (or that's the theory)
 it's much easier to start the thread die if you taper the bolt end first
here is one finished bolt, 3 more to go
custom 1/4" ss thru bolts at daggerboard case top corners

Saturday, January 17, 2015

Daggerboard Case install

daggerboard case installed in setup

Saturday, January 10, 2015

Keel and Gunnels done

 keel is laminated to accomodate curvature



Saturday, January 3, 2015

Mainhull is set up !

frame 7 to bow: carefully leveled, squared and braced 

frame 7 to stern

stern area

view down the middle, everything lines up nicely (1/16")

when the weather warms up to above freezing,
the keel, dagger board trunk, then the gunnels can be fitted and glued in