Thursday, November 22, 2012

Deck prep work starts

 float is upright for deck prep work

side view of glassed hull before deck work

Friday, November 16, 2012

Epoxy coating the float interior

turning the hull on it's side made it easier to reach inside to brush on 3 coats of epoxy

this way gravity helped the epoxy to flow out smooth

Sunday, November 4, 2012

Fiberglassing

 glass cloth positioned dry


- cloth overlaps the keel 2" from both sides
- two strips of cloth, 2" and then 3" wide, were previously epoxied over the keel
- this gives 4 layers over the keel for toughness
epoxy was applied by 10" window style squeegee 
small stapled wood scraps holding the cloth will be removed after wetout